- Etec
- Projects Home
- Urban planning and Infrastructure
BCD infrastructure lebanon
ETEC was assigned to design 36 kms of totally new infrastructure and 9 different sophisticated networks (stormwater, drainage, sewerage, electricity, telephone, data) for Beirut Central District, as a part of the reconstruction project of the heart of the city after the war.
- City : Beirut
- Country : Lebanon
- Built-up Area : m²
- Client : Mouawad-Edde Construction Company
- Mission : Design Review & Construction drawings
- Year : 1995-1997
- Value : 65 000 000 US$
- Etec
- Projects Home
- Urban planning and Infrastructure
Urbanization mtayn village
The project consists to establish a Master Plan for the village of Mtayn in the Matn Caza by assembling the updated cadastral plans, a preliminary investigation on the status of the existing buildings, the actual zoning and a demographic study. A roads network and zoning plan for the region including a new construction regulations had been proposed in order to promote a social and economical development and the future demographic extension. For this, the study recommended many directives concerning the necessary equipments the region is in need, the protection of its natural, historical and archeological sites.
- City : Mtayn
- Country : Lebanon
- Built-up Area : 2 200 ha
- Client : Urban Planning Directorate
- Mission : Design and master plan
- Year : 2004-2005
- Value : -
- Etec
- Projects Home
- Urban planning and Infrastructure
South lebanon urbanization
South lebanon urbanization
- City : South of Lebanon
- Country : Lebanon
- Built-up Area : 2 000 hectares
- Client : Town Planning Directorate
- Mission : Design and master plan
- Year : 2001-2002
- Value : -
- Etec
- Projects Home
- Urban planning and Infrastructure
New hamala housing master plan
The project is located on a plot of land in Janabiya off. Sh. Issa Highway, and is situated on the intersection of two Roads (Avenue 27 and Avenue 79). It is envisaged to provide an environment for serenity living. Based on the applicable zoning, the project will be 4 to 6 floors. high in addition to a basement car parking supplying the market with approximately 350 terraces houses and mid high quality apartments, both types range in size from 120 to 200 m². The project will feature a supporting retail component as well, which is intended to serve the project’s residents and the population from neighbouring properties in the area providing all necessary retail and services outlets for day to day living. The project will also have provision for ample parking spaces.
- City : Hamala
- Country : Bahrain
- Built-up Area : 600 000 m²
- Client : Private
- Mission : Concept Design, Execution drawings and Tender documents
- Year : 2008
- Value : 350 000 000 US$
- Etec
- Projects Home
- Urban planning and Infrastructure
Hay ajyal housing development
The project consists of an urban design study covering the zoning, the land use, the Road and Traffic assessment and the Landscaping of the public spaces – Plots area is 220 000 Sq.m.
- City : Manama
- Country : Bahrain
- Built-up Area : 338 000 m²
- Client : Private
- Mission : Study & Design
- Year : 2006
- Value : 240 000 000 US$
- Etec
- Projects Home
- Urban planning and Infrastructure
Grand axis of beirut
Solider was intending to create a grand axis in Beirut city in order to create a green lung, including import archeological site, a marina, a boulevard promenade and a water front development (barbour, shops, restaurants, coffee shops, etc).
- City : Beirut
- Country : Lebanon
- Built-up Area : - m
- Client : Solider
- Mission : Competition
- Year : 2004
- Value : -